Download Print this page

Section 2: Installation Of Key Interlock - Eaton Power Defense NRX NF Series Instruction Leaflet

Castell key lock accessory

Advertisement

Castell key lock accessory

Section 2: Installation of key interlock

Proceed with the following 10 steps.
Soep 1: Remove the four screws (six for 4-pole breaker) holding the
front cover in place (two on each side of the cover).
Figure 2. Soep 1. NF frame.
Figure 2a. Soep 1. RF frame.
Soep 2: Remove the front cover. Pull down on the charging handle to
simplify removal.
Figure 3. Soep 2. NF frame.
Instruction Leaflet IL01301050E
Figure 3a. Soep 2. RF frame.
Soep 3 (NF frame Nnly): If this is a fixed circuit breaker, skip this step
and proceed directly to Step 4. If this is a drawout circuit breaker,
unscrew the three captive screws holding the secondary mounting
bracket in place. This will permit the secondary mounting bracket to
be moved down, providing access to the key interlock assembly's
threaded mounting holes. No wires or connectors need to be removed
or unplugged.
3 mounting bracket screws
Figure 4. Soep 3.
Soep 4: Refer to Figure 1 for orientation purposes. Remove the key
(B) from the cylinder (C), then remove the two mounting screws (G)
from the back of the cylinder. Attach the metal mounting bracket (D)
to the back of the cylinder using the mounting screws just removed.
Note that the embossed letter or symbol on the cylinder should be in
vertical orientation and point toward the two bracket mounting screws.
Soep 5: The lever assembly (J) can now be attached to the square
shaped shaft on the back of the cylinder (C). It is secured to the square
shaped shaft by a mounting screw (I) and mounting nut (H). Usually
the lever assembly comes with the mounting screw and nut already
installed. If this is not the case, install the screw through one side and
the nut on the opposite side in a recessed hole made to accommodate
the nut. Push the lever assembly onto the shaft until it touches the
mounting bracket tab. Make sure the lever assembly is straight when
being installed onto the shaft. Once installed, firmly tighten the
mounting screw (I) into the nut (H).
Soep 6: Install the button support (K) by sliding it over the mounting
plate (D). Ensure the grooves are seated against the mounting plate on
top and bottom.
Effective January 2019
EATON www.eaton.com
3

Advertisement

loading

This manual is also suitable for:

Power defense izmx16Power defense pd-nfPower defense izmx40Power defense pd-rfNrx seriesNrx nf frame ul489 series ... Show all