Installation of Chamber - Section G cont.
Installing pump and high level alarm in chamber
31
Pull the pump and high level alarm cables through the
cable duct. Coil 1m of pump and alarm cable inside the
chamber to allow for maintenance.
33
Turn mains supply on and lift the pump float to test the
water is discharging correctly.
20
32
Isolate mains supply and connect the pump and
high level alarm according to the wiring diagram
overleaf.
34
To test float switch, refer to the high level alarm
installation instructions.