This manual is to be left
with the pump station or
the homeowner
Delta Foul V3 (DMS-165-1)
For Foul Water Applications
Installation Instructions
Ground Water Pump Station

Advertisement

Table of Contents
loading

Summary of Contents for Delta Membranes Delta Foul V3

  • Page 1 This manual is to be left with the pump station or the homeowner Delta Foul V3 (DMS-165-1) For Foul Water Applications Installation Instructions Ground Water Pump Station...
  • Page 2 Delta Foul V3 01992 523 523 info@deltamembranes.com www.deltamembranes.com Delta House, Merlin Way, North Weald, Epping, Essex. CM16 6HR Legal information/Copyright All rights reserved. Contents provided herein must neither be distributed, copied, reproduced, edited or processed for any other purpose, nor otherwise transmitted, published or made available to a third party without express written consent from Delta Membranes.
  • Page 3: Table Of Contents

    Delta Foul V3 Contents Foul V3 Overview Parts Included Optional Extras Discharge Pipework & Fittings Chamber Overview Spare Parts Technical Information Pump Chamber Depth Limits Installation Guidelines Pump Station Location 10.0 RC Box Dimensions 11.0 Installation of Chamber Section A - Construction of reinforced concrete box...
  • Page 4: Foul V3 Overview

    Foul V3 Overview The Delta Foul V3 is a packaged pump station designed to collect foul water. Typically, the Foul V3 would be used to collect and discharge foul water from a basement fitted with a bathroom and utility room. This pump station is not designed to collect ground water from a cavity membrane system (see Delta Dual V3 - DMS 164).
  • Page 5: Discharge Pipework & Fittings

    Delta Foul V3 Discharge Pipework & Fittings A selection of discharge pipework and fittings are available for the Foul V3 pump station. Should you require to place an order for any of these items, please complete the form below, scan and email to purchasing@deltamembranes.com to allow us to process your order.
  • Page 6: Chamber Overview

    Delta Foul V3 Chamber Overview Part Description Foul V3 Chamber Screed Cable Duct Insulation Discharge Pipe MS20 Distribution Board Basement Slab Non-switched Fused Spur Inlet Pipe Vent Pipe Concrete Base AlertMaxx2 Manhole Cover Membrane sealed to chamber with Delta 150mm corner strip...
  • Page 7: Technical Information

    Delta Foul V3 Technical Information Pump Specification Pump Type D10SA 8.30 7.50 6.30 Typical Duty (I/s) Head (m) 5.00 3.70 2.30 Power (kW) 1.15 0.75 (kW) 5.88 Current (a) Power Phase Single Non-switched Fuse Spur Rating (a) RCBO Rating (a) Cable Length (m) Max.
  • Page 8: Pump Chamber Depth Limits

    Delta Foul V3 Pump Chamber Depth Limits If the inlet does not allow the pump chamber to be within depth limits, please contact PPS on 01279 757400 to discuss chamber options. < 500mm The pump chamber must be installed no more than 500mm below floor finishes.
  • Page 9: Installation Guidelines

    Delta Foul V3 Installation Guidelines The following instructions are for guidance only and it is the contractors responsibility to ensure that the installation is in accordance with the prevailing ground conditions and good building practice, to eliminate any potential damage to the pump station either during or after installation.
  • Page 10: Installation Of Chamber

    Delta Foul V3 11.0 Installation of Chamber - Section A Construction of reinforced concrete box Excavate hole for chamber. Refer to section 10.0 for RC Install re-bar as per structural engineer's drawings. box internal dimensions. Lay inlet and discharge pipework. Allow pipework to Pour concrete to form RC box as per structural protrude into RC box by a minimum of 100mm.
  • Page 11: Section B - Connecting 110Mm Inlet Pipework

    Delta Foul V3 11.0 Installation of Chamber - Section B Connecting 110mm inlet pipework Saw off socket end/s, where inlet pipe/s are to Position chamber in RC box. be connected. Fit push fit coupler. Connect inlet pipework to the required chamber spigot.
  • Page 12: Section C - Connecting Discharge, Cable Duct And Vent

    Delta Foul V3 11.0 Installation of Chamber - Section C Connecting discharge, cable duct and vent Wrap the thread on a high pressure male iron with PTFE Screw the high pressure male iron into the socket. tape. Apply high pressure glue around the first 20mm of the...
  • Page 13 Delta Foul V3 11.0 Installation of Chamber - Section C cont. Connecting discharge and cable duct Ensure a draw cord is pulled through the cable duct as the cable duct is built.
  • Page 14: Section D1 - Backfill Around Chamber With Concrete (Rc Box)

    Delta Foul V3 11.0 Installation of Chamber - Section D1 Backfill around chamber with concrete To be followed when installing chamber in an RC box. Check all pipes are connected to the chamber Completely fill chamber with water. correctly. Fill void between RC box and chamber with concrete...
  • Page 15: Section D2 - Backfill Around Chamber With Concrete (Ground)

    Delta Foul V3 11.0 Installation of Chamber - Section D2 Backfill around chamber with concrete To be followed when installing chamber in the ground. Completely fill chamber with water. Fill void between soil and chamber with concrete (min. C35 grade) or as per engineer's drawings.
  • Page 16: Section D3 - Backfill Around Chamber With Concrete (Reinforced Cage)

    Delta Foul V3 11.0 Installation of Chamber - Section D3 Backfill around chamber with concrete To be followed when installing chamber in the ground with a reinforced cage. Completely fill chamber with water. Fill void between soil and chamber with concrete (min.
  • Page 17: Section E - Preparing Chamber For Installation Of Pump

    Delta Foul V3 11.0 Installation of Chamber - Section E Preparing chamber for installation of pump Pump out water from chamber. Manually remove any debris from chamber and residual water using a wet vac.
  • Page 18: Section F - Fitting Discharge To Pump

    Delta Foul V3 11.0 Installation of Chamber - Section F Fitting discharge to pump Wrap the thread on the nipple glued in to the 90˚ bend Hand tighten the discharge arm into the pump with PTFE tape. discharge outlet.
  • Page 19: Section G - Installing Pump And High Level Alarm In Chamber

    Delta Foul V3 11.0 Installation of Chamber - Section G Installing pump and high level alarm in chamber Fill chamber half full with water. Slide the DC65 over the discharge arm and lower the pump in to chamber to release any trapped air. Slide the DC65 up to join the manifold to the discharge arm.
  • Page 20 Delta Foul V3 11.0 Installation of Chamber - Section G cont. Installing pump and high level alarm in chamber Pull the pump and high level alarm cables through the Isolate mains supply and connect the pump and cable duct. Coil 1m of pump and alarm cable inside the high level alarm according to the wiring diagram chamber to allow for maintenance.
  • Page 21: Wiring Diagram (Inc. Alertmaxx2)

    Delta Foul V3 12.0 Wiring Diagram (inc. AlertMaxx2) Separate 16 Amp RCBO AlertMaxx2 High Level Alarm (DMS-299) For internal wiring of the high level alarm, please refer to the AlertMaxx2 instruction manual. 13 Amp Non-switched fused spur Pendant Float Switch Supplied with a 10m cable - The pump is supplied with a 10m cable.
  • Page 22: Wiring Diagram (Inc. Alertmaxx2 & Hi-Powermaxx)

    Delta Foul V3 12.0 Wiring Diagram (inc. AlertMaxx2 & Hi-PowerMaxx) Separate 16 Amp RCBO’s AlertMaxx2 High Level Alarm (DMS-299) For internal wiring of the high level alarm, please refer to the AlertMaxx2 instruction manual. 13 Amp Non-switched fused spur MaxxConnect Cable...
  • Page 23: Maintenance

    Packaged Pump Systems (PPS) have an 18 month component guarantee from date of commissioning. Any defects or malfunctions should be reported to Delta Membranes immediately to avoid any damage to other components. All broken components must be sent to Delta Membranes at the customers cost.
  • Page 24: Troubleshooting

    Delta Foul V3 16.0 Troubleshooting Please ensure the installation process has been completed thoroughly and all steps have been followed correctly. Use the table below to assist with troubleshooting and if problems still occur, please contact the PPS Technical Department on 01279 757400 from 9:00am - 5:00pm or email info@ppsgroupuk.com.
  • Page 25 Delta Foul V3 Notes...
  • Page 26 Head Office: Delta House, Merlin Way, North Weald, Epping, Essex, CM16 6HR 01992 523 523 | info@deltamembranes.com | www.deltamembranes.com...