Delta Foul V3
11.0
Installation of Chamber - Section A
Construction of reinforced concrete box
1
Excavate hole for chamber. Refer to section 10.0 for RC
box internal dimensions.
3
Lay inlet and discharge pipework. Allow pipework to
protrude into RC box by a minimum of 100mm.
10
2
Install re-bar as per structural engineer's drawings.
4
Pour concrete to form RC box as per structural
engineer's drawings.