Installation of Chamber - Section D2
Backfill around chamber with concrete
To be followed when installing chamber in the ground.
17
Completely fill chamber with water.
19
Allow concrete to cure.
18
Fill void between soil and chamber with concrete
(min. C35 grade) or as per engineer's drawings.