Section D3 - Backfill Around Chamber With Concrete (Reinforced Cage) - Delta Membranes Delta Foul V3 Installation Instructions Manual

Ground water pump station
Hide thumbs Also See for Delta Foul V3:
Table of Contents

Advertisement

Delta Foul V3
11.0
Installation of Chamber - Section D3
Backfill around chamber with concrete
To be followed when installing chamber in the ground with a reinforced cage.
20
Completely fill chamber with water.
22
Allow concrete to cure.
16
21
Fill void between soil and chamber with concrete
(min. C35 grade) or as per engineer's drawings.

Advertisement

Table of Contents
loading

Related Products for Delta Membranes Delta Foul V3

This manual is also suitable for:

Dms-165-1

Table of Contents