YES 45 FS/FI Storefront System
FRAME ASSEMBLY
STEP 6 (Continued)
FABRICATE SILL FLASHING
-For openings longer than 24'-0" the sill flashing needs to be spliced every twelve to fifteen feet
at the center of a D.L.O.
-Allow for a 3/8" joint for expansion between sill flashing members.
See Detail 10.
3/8"
Sill Flashing
DETAIL 10
Page-14
02-4001-09 | Effective Date: May 29, 2018