Fabricate Tubular Verticals For Shear Block Assembly - Ykk ap YES 45 FS Installation Manual

Table of Contents

Advertisement

STEP 2 (Continued)

FABRICATE TUBULAR VERTICALS FOR SHEAR BLOCK ASSEMBLY

YES 45 FS & YES 45 FI:
-Cut the vertical and jamb members to the frame height determined in Step 1.
-Tubular verticals require shear blocks for the attachment of head, horizontal and sill members:
E1-1012 for YES 45 FS.
E1-1013 for YES 45 FI.
Note: Open back horizontals, E9-1004 (YES 45 FS) and E9-1014 (YES 45 FI),
and sills, E9-1069 (YES 45 FS) and E9-1089 (YES 45 FI), must be used
when using shear blocks.
-Mark the location for each shear block using one of the methods below:
1. Use a short piece of each horizontal member with a shear block installed as a template.
Center the template on the face of the vertical and mark each hole location.
2. Layout the shear blocks as shown in Detail 5.
-Drill a 0.161" diameter hole (#20 drill bit) at each location marked.
-Attach the shear blocks to the verticals using three (3) PC-1028 fasteners.
EXTERIOR
YES 45 FS
Page-10
FRAME FABRICATION
C L
3-1/8"
1-3/8"
0.161" Dia.
Holes (Typ.)
Top of
Horizontal
INTERIOR
Detail 5
YES 45 FS/FI Storefront System
EXTERIOR
YES 45 FI
02-4001-09 | Effective Date: May 29, 2018
C L
3-1/4"
3/4"
0.161" Dia.
Holes (Typ.)
Top of
Horizontal
INTERIOR

Hide quick links:

Advertisement

Table of Contents
loading

Related Products for Ykk ap YES 45 FS

This manual is also suitable for:

Yes 45 fi

Table of Contents