Chapter 2 Mechanical Installation; Meter Piping, Lifting And Mounting - Emerson Daniel 3818 Installation Manual

Lng liquid ultrasonic meter for cryogenic liquefied natural gas applications
Hide thumbs Also See for Daniel 3818:
Table of Contents

Advertisement

Installation manual
3-9000-771
2
Mechanical Installation
2.1

Meter piping, lifting and mounting

Refer to the following sections for piping recommendations, lifting with hoist rings and
slings, mounting in cooled pipelines and safety warnings and precautions.
SURFACE TEMPERATURE HAZARD
The meter body and piping may be extremely cold.
Wear appropriate personal protective equipment when coming in contact with the
meter.
Failure to comply may result in injury.
TRIPPING HAZARD
Clear all obstacles or obstructions from the work area when transporting, installing or
removing the meter.
Failure to clear the work area may cause injury to personnel.
CUTTING HAZARD
Sharp edges may be present on the meter.
Wear appropriate personal protective equipment when working on the meter.
Failure to comply can cause serious injury to personnel.
TRANSPORTATION HAZARD
When moving the meter, do not insert the forks of a forklift into the bore.
Inserting the forks may cause the meter to become unstable, resulting in injury or
damage to the bore and sealing face.
Installation manual
CAUTION
CAUTION
WARNING
CAUTION
Mechanical Installation
May 2019
27

Advertisement

Table of Contents
loading

Table of Contents