Cable Cover Installation - Datalogic TaskBook User Manual

Rugged industrial tablet
Table of Contents

Advertisement

Appendix 1 - Docking Station

Cable Cover Installation

To ensure water and dust resistance, cables and empty
holes have to be fitted with the dedicated rubber grommet.
If the cables are not properly fastened or if any empty
holes haven' t been protected, you may expose your Docking
CAUTION
Station to shock, short-circuit and other problems that may
damage the device. Without a cable cover, dust and
moisture can get into the device. Inspect the seal to ensure
it is undamaged and intact.
Grommet Release
Grommet without
cable
To correctly install the cable, please choose the appropriate
grommet. Remove the grommet from the bridge so that no overhang
remains.
Correctly released grommets
(no overhang)
94
Grommet for
cable up to 6 mm
Incorrectly released grommets
(overhang present)
Grommet for
cable from 6 mm
TaskBook

Advertisement

Table of Contents
loading

Table of Contents