Baoding Shenchen F Series Manual page 6

Precision pump
Table of Contents

Advertisement

Shenchen Pump
F Series Operation Interface Instruction:
4.1.Booting Interface:
After power on the system, enter the welcome interface, Click anywhere or wait
for 2.5 seconds, the system will automatically enter the English main interface.
4.2.Main Interface:
Main Interface Composition as below:
A. Real-time Display Volume: Select the specific mode and display
content in the system setting interface. In transfering mode, display the
speed or flow rate in real time, you can modify the motor speed or flow
rate by directly clicking on A area. In dispensing mode, display
dispensing volume or current total dispensing numbers.
B.
Real-time Dynamic Display: Display the dispensing and transferring
state and monitor result
C. Real-time Parameter Display
In dispensing mode: Display dispensing parameters, include dispensing
volume, current dispensing time count down, current pause time count
down, copy numbers.
In transferring mode: Display the current transferring total volume,
and current working time. The total transferring volume maximum is
9999L. The current working time maximum is 9999 hour. Each one of it
C
B
A
00.00
ml
Disp. Vol.
10.00 ml
Disp. Time
1.00 s
Pause Time
1.00 s
Copy CNT 0000/0005
D
2012-3-15 8:45:05 AM
/
Work Status
Pump Head YZ1515x
Tube Size
25#
Suck-Back 0.00
F
G
I
J
- 3 -
F Series
E
H
K

Advertisement

Table of Contents
loading

Related Products for Baoding Shenchen F Series

This manual is also suitable for:

F1F6F3F6-3lF6-6lF6-12l

Table of Contents