Download Print this page

Advertisement

Quick Links

Shenchen Precision Pump
Manual of YZ35 Aluminum
Alloy Pump Head

Advertisement

loading

Summary of Contents for Baoding Shenchen YZ35

  • Page 1 Shenchen Precision Pump Manual of YZ35 Aluminum Alloy Pump Head...
  • Page 2 Note Please read the manual carefully before operating the product. Warning: Tubing may have cracks due to wear. It results in the overflow of fluid from tubing. In that time human body and instruments may be damaged. Therefore, the user must check frequently and change the tubing in time.
  • Page 3: Table Of Contents

    Catalog 1. Product Introduction: ......... - 1 - 2. Instructions............- 2 - 3. Installation Dimension.......... - 6 - 4. Maintenance ............- 7 - 5. Warranty and After Service ........- 8 -...
  • Page 4: Product Introduction

    Shenchen Pump YZ35-Aluminum Alloy Pump Head Product Introduction: It is very convenient to change tubing on an easy load pump head. Following customers’ requirement, it can connect multi channels, suitable for OEM supporting application which reduce customer’ repair and maintenance costs greatly.
  • Page 5: Instructions

    Shenchen Pump YZ35-Aluminum Alloy Pump Head Instructions Rotary knob Upper block body spanner Rollers Tube clamp Mounting hole Holder ◼ Tube Installation Pull the spanner anti-clockwise 180° to open the upper block. Put the tube between rollers and upper block, then pull the tube front and back to adjust it.
  • Page 6 Shenchen Pump YZ35-Aluminum Alloy Pump Head External tube clamp: 26#,73#,82#; in general applicable to PharMed tube. External Tube Clamp The installation method is as follows: Draw two lines with a distance of 186 mm on the tube. Put the tube between rollers and upper block, then pull the tube back and forward to adjust it.
  • Page 7 Shenchen Pump YZ35-Aluminum Alloy Pump Head Put the external tube clamp on both sides of the tube respectively. - 4 -...
  • Page 8 Shenchen Pump YZ35-Aluminum Alloy Pump Head After the external tube clamps on both sides are installed into the groove, and the tube has been adjusted to make the outermost sides of the tube clamp coincide with the marked line on the tube. Then press down the upper block.
  • Page 9: Installation Dimension

    Shenchen Pump YZ35-Aluminum Alloy Pump Head Installation Dimension - 6 -...
  • Page 10: Maintenance

    Shenchen Pump YZ35-Aluminum Alloy Pump Head Maintenance When pump is not working, please loosen the cartridges pressing the tubing to avoid changing the shape of the tubing because of longtime extrusion. Keep the rollers of the pump head clean and dry, otherwise it can quicken the wearing of the tubing, reduce the useful life of the tubing and lead the rollers to damage in earlier.
  • Page 11: Warranty And After Service

    Shenchen Pump YZ35-Aluminum Alloy Pump Head Warranty and After Service Products have 1 year warranty (not including tubing). In the warranty, if the products are damaged because of users’ wrong operation or other human damages, our company is not responsible for warranty. Beyond the warranty, we only charge the cost of maintenance.
  • Page 12 MADE IN CHINA Baoding Shenchen Precision Pump Co., Ltd. Address:No.103,Building 2, Pivot Industrial Park, FuXing Eas t Road999, Baoding,China. Tel: 86- 0312- 6780680 6780681 Fax: 86-312- 6780636 Website: www.good-pump.com Email: info@good-pump.com...