Notes on mounting
location of room units
Prior to commissioning
70 / 84
Siemens
Building Technologies
Business
Showroom
Sports facility
Select the best compromise between Illuminance, ventilation locations and
aesthetic requirements.
Where possible, install room units opposite windows with the longest daylight
exposure.
Avoid recesses without sufficient daylight.
With regard to future room use: Select a mounting location where the room unit
is not shaded by users (e.g. by moving around furniture).
Fig.: Examples for brightness on various locations in a typical office (desk EA = 500 lx)
Whether illuminance on the wall is actually 200 lx, depends in large measure on
local conditions. We recommend conducting reference measurements using a
luxmeter. A device with battery backup can be used is illuminance is insufficient
(see Section 14.3).
Solar energy cells must be charged prior to commissioning (especially after
storage for long periods in darkness prior to initial installation). This occurs
automatically as soon as the solar cell is exposed to light.
The device is fully operational after 3 to 4 days if the initial charge is not enough.
The energy is now sufficient to ensure full functionality even after darkness (even
at night or on weekends for up to 90 hours).
Desigo TRA Engineering, mounting and installation
EnOcean RF networks
Restaurant
Bathrooms
Bars
Hallways
Stairwells
Sales room
Showroom
Packaging area
Break room
Conference room
Both
Interior
150 - 300 lx.
100 - 300 lx.
50 - 150 lx.
50 - 100 lx.
50 - 150 lx.
300 - 1000 lx.
500 - 1500 lx.
200 - 300 lx.
300 - 500 lx.
300 - 700 lx.
300 - 500 lx.
200 - 500 lx.
CM111043en_09