6.1 Test Environment Preparation:

Before updating S230HL software, the following items must be ready in progress.

6.1.1 Hardware Required:

- S230HL set*1pcs
- PC with Windows XP
- D-sub cable*1pcs
- USB cable*1pcs

6.1.2 Software Preparation:

- Mstar utility ISP_Tool.exe'
- Latest firmware binary files

6.2 Hardware Configuration:

6. Firmware Upgrade Process
S230HL set *1 pcs
D-sub Cable*1pcs
Connect USB to PC host
for ISP Programming
Mstar ISP Board *1 pcs
USB Cable*1pcs
Connect D-sub to monitor
for ISP Programming
MSTAR ISP BOARD