SPLICE INTO
#7 WIRE
SPLICE INTO
#1 WIRE
SPLICE INTO
#2 WIRE
#8 WIRE TO
LIFT SWITCH
4
SEE NOTE 1
R7090
12-88
1
TO HOUR
METER NEG
2
FROM PUMP
MTR SOLENOID
3
5
TO HOUR
METER POS
6
7
8
9
11
12
10
13,14,15
ENLARGED VIEW B-B
DIODE ASSEMBLY
Figure 12-50 Optional Hour Meter Installation
17
20
19
ENLARGED VIEW A-A
HOUR METER WIRE CONNECTIONS
A
077203 (3)
ROT AT ED 90° FROMPMOUNT ING POS IT ION
059410 (3)
B
B
NOTES:
1. #8 WIRE FROM THE SPLICE ON PUMP SOLENOID
LEAD MUST TERMINATE IN POSITION #3 OF 005647
CONNECTOR (AT 505932 DIODE BLOCK ASSY).
2. AFTER INSTALLATION OF DIODE ASSY, MAKE SURE
TRUCK CABLES, WIRES, ETC. ARE CLEAR OF DIODES.
2
21
TO #7 WIRE OF
CONTROL CABLE ASSY
18
17
A
16
REPLACES EXISTING
LATCH MTG SCREWS
902997
Need help?
Do you have a question about the Big Joe PDC Series and is the answer not in the manual?