Activating The Drc Gui; Time Constants Button - Texas Instruments TAS5706EVM2 User Manual

Table of Contents

Advertisement

Using the EVM Software
Next, using the right button of the mouse, select Activate DRC GUI
Set the compression ratio to a value between 1 and 50.
The offset has a range of ±6 dB. A value of 0 is illegal. If no offset is required, set the offset to 0. Offset is
generally not required in a DRC application because is just provides a gain.
Threshold is selected with a value of 0 to –72 dB.
Time constants: Select the time constants to adjust the energy, attack, and decay filters
14
TAS5706EVM2
Figure 13. Activating the DRC GUI
Figure 14. Time Constants Button
(Figure
13).
(Figure
SLOU220 – September 2008
Submit Documentation Feedback
www.ti.com
14).

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TAS5706EVM2 and is the answer not in the manual?

Table of Contents