General Information
Installing utility lines
Ample space is provided for electrical and plumb-
ing lines.
See Utility Specifications on page 2.
sealing structure to the floor
a) Loosen lower finish panel screws until lower
panel drops to the floor (1" adjustment).
b) Tighten finish panel screws.
c) Tile floor.
d) For sanitary purposes, the bar can then be
sealed to the floor using your choice of methods.
Form No. Z22162
Rev. 06.12.10
Perlick is committed to continuous improvement. Therefore, we reserve the right to change specifications without prior notice.
6
Need help?
Do you have a question about the MBS and is the answer not in the manual?