4. Open the air supply valve (125 psi, 8.6 Bar, 0.86
MPa maximum). If necessary, use a regulator in
the supply air line to meet these specifications.
NOTE: Make sure the air supply meets
NOTE:
NOTE:
appropriate air
air flow
the appropriate
appropriate
air
Technical Specifications, page
334667G
flow requirements.
requirements. See
flow
requirements.
49.
5. Connect the blast hose, hose restraints, control
hoses, and coupler pins.
NOTE:
NOTE: If you are using an electric blast control,
NOTE:
check all of the electrical connections from the
panel to the blast control.
Make sure no electrical connections will
be exposed to water. Exposure to water
could cause a short circuit and damage the
equipment.
Operation
NOTICE
NOTICE
NOTICE
13