AT&T System 75 Wiring Diagram page 81

Hide thumbs Also See for System 75:
Table of Contents

Advertisement

Connecting Control Carrier Outputs Cable
Installing Trunk Cables Between Network Interface, Sneak
Fuse Panel, and Switch Cabinet
Connecting Trunk Pairs to the Switch Cabinet Using
Concentrator Cables
Connecting Trunk Pairs to the Switch Cabinet Using Jumper
Wires To Establish 3-Pair Modularity
Installing Coupled Bonding Conductor (CBC) Grounding
Installing Connector Cables Between Switch Cabinet and the
Cross-Connect Field
Installing Connector Cables Between Auxiliary Cabinet and
Cross-Connect Field
Station Wiring Design
General
Information Outlets
Station Cables
Closets
Station Circuit Distribution From Equipment Room
4-Pair Station Circuits
3-Pair to 4-Pair Station Circuit Distribution
Layout
Locating Information Outlets
Locating Satellites and Sites
Sizing 4-Pair Station Cables
Sizing 25-Pair and Multiple 25-Pair Station Cables
-ii-
3-77
3-77
3-81
3-83
3-86
3-89
3-89
3-90
3-90
3-91
3-91
3-94
3-98
3-98
3-101
3-107
3-107
3-107
3-107
3-108

Advertisement

Table of Contents
loading

This manual is also suitable for:

System 75 xe

Table of Contents