9 Installation
Which fixation position to use
a
b
a
In case to fix on the pipe
A
Second clamp after the second elbow
B
First clamp after the second elbow
Installer reference guide
54
a
b
In case to fix on the sleeve
Maximum distance between clamps
Vertical position of pipe
2000 mm
▪ Divide the length between the brackets evenly.
▪ Every system MUST contain at least 1 bracket.
▪ Position the first clamp at a maximum of 500 mm from the
gasboiler.
b
Other position of pipe
1000 mm
EJHA04AAV3 + EHY2KOMB28+32AA
Daikin Altherma Hybrid hydrosplit heat pump
4P531180-1 – 2018.06