Emptying The Collection Container; Emptying Versions; Emptying By Forklift (A); Emptying By Crane (B) - Kärcher Ringler RI 311 W2G Original Operating Manual

Table of Contents

Advertisement

Operation
Because of the slowing-down time of the turbine, the vibration process must only be started 1-2min
after turn off.
Pos : 10.8.7 /7 Betri eb, Bedienung/War ten Sie ca. 30s ec., bevor Sie das Ger ät wieder i n Gang s etz en @ 2\mod_1337328413779_131.doc x @ 13436 @ @ 1
Wait approx. 30sec. for the dust to settle, before restarting the device.
Pos : 10.9.1 /7 Betri eb, Bedienung/Ü bersc hrift: Entl eeren des Sammel behälters T yp RI 311 @ 3 \mod_1352907055541_131.doc x @ 34229 @ 2 @ 1
7.4

Emptying the collection container

Pos : 10.9.2 /1 Gr undleg ende Sic herheits hinweis e/Sig nal wort-Fel d " Vorsic ht" @ 0\mod_1261404898171_131.doc x @ 899 @ @ 1
Pos : 10.9.3 /1 Gr undleg ende Sic herheits hinweis e/Hinweis N etz stec ker ziehen @ 0\mod_1261407392098_131.doc x @ 939 @ @ 1
Before starting work remove the plug from the wall socket!
Pos : 10.9.4 /7 Betri eb, Bedienung/Vor dem Entl eer en des Sammel behälters , M otor aussc halten und Netzstec ker zi ehen! @ 3\mod_1352907478503_131.doc x @ 34252 @ @ 1
 Before emptying the collection container, deactivate the motor and pull the mains plug!
Pos : 10.9.5 /7 Betri eb, Bedienung/Spänes aug er/Bei der Entl eer ung des Ringl er -Industries augers mit dem Kran oder dem Gabelstapl er ist der Aufenth @ 3 \mod_1352975855122_131.doc x @ 34374 @ @ 1
 Never stay in the working area when emptying the Ringler industrial extractor with a crane or
forklift!
Pos : 10.9.6 /7 Betri eb, Bedienung/Ü bersc hrift: Entl eervarianten @ 3 \mod_1352907686385_131.doc x @ 34262 @ 2 @ 1
7.5

Emptying Versions

Pos : 10.9.7 /7 Betri eb, Bedienung/Skizze Stapler entleerung, Kranentl eerung, U nter flurentl eerung T yp RI 311 W2G/W2E @ 3\mod_1352972044581_0.doc x @ 34333 @ @ 1
Pos : 10.9.8 /7 Betri eb, Bedienung/Entl eer varianten mittels H ubstapl er, Kran oder U nterflurför der er @ 3\mod_1352907771036_131.doc x @ 34272 @ 333 @ 1
7.5.1

Emptying by forklift (A)

 Lift the extractor RI 311 with a forklift via the chassis.
 Lift collecting container, open manual emptying flap above container
7.5.2

Emptying by crane (B)

 Attach snap hook of crane bracket (accessories) in crane lugs at the collection container.
 Lift collecting container, open manual emptying flap above container
7.5.3

Emptying into underfloor conveyor (C)

 Open manual emptying flap over chute
Pos : 11.1 /8 Stör ungss uc he und Stör ungs besei tigung/Störungssuche und Störungsbes eitigung @ 0\mod_1263801277821_131.doc x @ 1480 @ 1 @ 1
CAUTION
19/53

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ringler ri 311 w2e

Table of Contents