SEN04132-01
27. Disconnect the clamp of wiring harness (35).
28. Move plates (36) and (37) together with wiring
harness (35) to the boom side.
29. Disconnect PPC hose (40) of the work equip-
ment. From the top, the color of the band is:
Red
None
Black
White
Yellow
Blue
Brown
Green
a Prepare an oil sump.
a Disconnect hose dump.
24
50 Disassembly and assembly
30. Sling floor frame assembly (42) and remove it.
a Make sure that the hoses, connectors,
clamps, and so on are disconnected with-
out fail.
4
Floor frame assembly: 250 kg
PC130-8