Download Print this page

Arrow SBS64 Owner's Manual & Assembly Manual page 36

6’ x 4’

Advertisement

ANCHORING OPTIONS...
IMPORTANT:
• If you have swing doors, they must hang and swing level before anchoring building.
• Anchor your building at this time. See below for details on anchoring.
• Please take a moment to ensure that the building is installed in accordance
with these instructions and with all applicable regulations.
Anchoring Down The Building
The entire fl oor frame MUST be securely anchored once the building is erected.
Below are recommended ways of anchoring.
Anchoring into Concrete:
1. For poured concrete slab or footing or patio blocks:
Use 1/4" x 2" (6 mm x 51 mm) Lag Screws.
2. For Anchor Post of Concrete poured after building is
erected: Use 1/4" x 6" (6 mm x 152 mm) Lag Screws.
1.
Anchoring into Wood/Post:
Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm)
dia. holes provided in the frames for proper anchoring.
1.
2.
2.
36
32
31EE

Advertisement

loading