Installation; Preparing For Installation; Mounting; Connection Diagrams - WEG MMW03-M22CH User Manual

Energy analyzer
Table of Contents

Advertisement

www.weg.net

2 INSTALLATION

2.1 PREPARING FOR INSTALLATION

DANGER!
Assembly and related connections of the product, must be implemented by authorized persons in accordance with the
instructions of user manual.
DANGER!
The device must not be put into service if the operator is not sure that all connections are correctly accomplished.

2.2 MOUNTING

MMW03-M22CH is placed vertically into the gap located in the panel. After the product is placed into the panel,
fixing brackets should be installed on the product. After that it should be fixed to the panel wall with the screws.
DANGER!
Before wiring up voltage and current ends to MMW03-M22CH, you must be sure that the power is cut.
DANGER!
The product is connected to current transformer(s). Before disconnecting current transformer leads, be sure that they are
short circuited elsewhere or connected to a parallel load which has sufficiently low impedance. Otherwise dangerously high
voltages will be induced at the current transformer leads. Same phenomena also apply for putting into service.

2.3 CONNECTION DIAGRAMS

2.3.1 3P-4W and 3p-3W Connections
There are two ways for connections of voltage and current. With neutral (3P-4W), without neutral (3P-3W).
3P-4W (with neutral)
12 | Energy Analyzer - MMW03-M22CH
Figura 2.1: Connection Diagram
3P-3W (without neutral)

Advertisement

Table of Contents
loading

Table of Contents