Download Print this page
Sime SOLIDA 8 PL Manual
Hide thumbs Also See for SOLIDA 8 PL:

Advertisement

INDEX
1
1. 1
DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.2
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
1.3
USE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2
2. 1
DESCRIPTION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.2
INSTALLATION . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
2.3
USE AND MAINTENANCE . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
48
49
52
53
54
60

Advertisement

loading
Need help?

Need help?

Do you have a question about the SOLIDA 8 PL and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Sime SOLIDA 8 PL

  • Page 1: Table Of Contents

    INDEX OPERATION WITH WOOD AND CARBON 1. 1 DESCRIPTION ..................INSTALLATION .
  • Page 2: Operation With Wood And Carbon

    “Test certificate” to be – Boiler body assembled and equipped with kept with the documents of the boiler. The cast iron “SOLIDA 8 PL” boilers are a loading port, ash boxes port, smoke cham- Miscellaneous accessories required to use...
  • Page 3: Installation

    INSTALLATION measured from the flame axis at the cuit heating installations (for example, for a exhaust of the chimney in the atmo- static column of 5 meters, the pre-loading sphere. For the dimensioning of the pressure of the tank and the loading pres- 1.2.
  • Page 4 The boilers “SOLIDA 8 PL” can assemble indif- The lever with the chainlet should be intro- knob (1) on, which is supplied in the ferently 2 types of thermostatic regulators.
  • Page 5 again in the same position. After having pla- “THERMOMAT RT-C” Regulator ced the knob at 60°C, block the lever with the chainlet in a slightly inclined position downwards, so that the chainlet will be in axis with the air gate damper. For the adjustment of the “Thermomat”, which essentially consists in the determina- tion of the chainlet length, proceed in the fol-...
  • Page 6: Use And Maintenance

    Closed expansion tank system with heat exchanger and optional thermostat valve LEGEND VE Expansion tank VS System safety valve 3 BAR - 1/2” VM Mixing valve VR Check valve PI System pump IR Heating system VT Thermostat valve SC Safety exchanger F Filter CAUTION: The safety exchanger is supplied in an 8105200...
  • Page 7: Operation With Pellets And Special Kit

    INTRODUCTION - Pellet feeder with motor and volute. advisable to use pellets that have been SOLIDA 8 PL boilers can be converted in - Painted pellet container (with capacities certified by an authorized body (the cha- order to be used with pellets.
  • Page 8: Installation

    INSTALLATION 2.2. 1 CONFIGURATION OF THE BOILER FOR THE USE WITH PELLETS AND OPTIONAL KIT A) Remove the blind flange in cast iron and disassemble the grille, hinge and hake along with the setting screws. Fig. 13: Disassembly of blind flange Fig.
  • Page 9 D) Block the inlet port if the boiler has already been used with wood or coal. Fig. 13.6: Inlet port E) Insert the micro pressing pin into the hole on the combustion chamber door and adjust its projection with nut M6. 27/28 mm Fig.
  • Page 10 H) Assemble the control panel after inserting the probes and the microswitch cable into the hole on the mantle cover. Remove the control panel cover and reassemble the cover after fixing the panel to the cover. Fig. 13. 1 3: Hole on cover Fig.
  • Page 11 M) Assemble the pellet container (with a capacity of 200 - 500 dm ) on the right of the boiler, in support to the boiler and align its front section. Fig. 13.20: Assembly of the elements of the pellet container...
  • Page 12 N) Push the feeder volute with the motor into its slot inside the pellet container (with a 200 -500 dm capacity) until its stops, and verify that the bucket is pointing upwards. Fix the volute onto the container using the screws that are already available on the container. Fig.
  • Page 13 9 Pellet’s estrance (safety sensor on the pellet’s inlet tube) Fig. 14 2.2.3 BOILER AND PELLET CONTAINER ASSEMBLY Feeder with volute motor Control panel Screw Boiler SOLIDA 8 PL Self-extinguishing pipe Pellet container with a 200 - 500 dm capacity Burner Fig. 15...
  • Page 14: Use And Maintenance

    USE AND MAINTENANCE 2.3. 1 CONTROL PANEL LEGEND Pump not active/summer Led screw ON Display Fan led 10 Manual rearmament thermostat Pump led 11 ON/OFF key Boiler led 12 Winter/summer key Flame led 13 Screw/set key Pump active/winter 14 Menu key Electric coil led 15 Main switch Fig.
  • Page 15 Introduction In case any error occurs, taking the boiler to the blowing - out, the The control panel regulates the working of the unit SOLIDA 8 PL, display shows an alternance of the messages “Alt” - “Spe” (indica- allowing automatic ignition and feeding of the fuel by the screw motor, drawing pellet directely from the container.
  • Page 16 C) Ignition condition: display Acc. contact thermostat, which can be It is divided in three phases: manually reset and that stops the pellet 1. Pre-heating of electric coil : increasing from being fed when the temperature coil temperature befor pellet’s feeding. inside the tube reaches 90°C.
  • Page 17 2.3.7 ELECTRICAL CONNECTION DIAGRAM It’s important to respect the polarity of the Connecting power supply main connection to avoid pellets burners respect polarity (LINEA 220 V) electronic devices malfunctioning. 10 POLES CONNECTOR FROM BOILER’S ELECTRONIC PANEL TO THE BURNER (JB) BURNER’S BODY IGNITION COIL IGNITION 1000 W...
  • Page 18 2.3.8 WIRING DIAGRAM POWER PLUG BOILER THERMOSTAT (OPTIONAL) MAIN SWITCH FAN FOR MAIN ROOM THERMOSTAT COMBUSTIVE (OPTIONAL) FUSE 5A AIR (BURNER) TYPE DELAYED MICROSWITCH DOOR MAX. THERMOSTAT WITH MANUAL RESET FEATURE VOLUTE IGNITION PLUG 1000 W C.H. PUMP RECIRCULATING/BOILER PUMP (OPTIONAL) NTC100K BOILER...
  • Page 19 2.3.9 TROUBLESHOOTING AND CORRECTIVE ACTIONS Before calling the technical support, take note of the serial number specified on the nameplate of the unit. Faults are sometimes signaled by a message that provides information on the related cause. The occurrence of an alarm causes the burner to shutdown (SPE). PROBLEM DISPLAY Alt +...
  • Page 20 The automatic pellets Alt + The pellet’s safety sensor shut-off: remove the charging doesen’t work (2) tPEL connector and make the manual rearmament (it is released at 90°). Check the reason of temperature resing is this position (cleaning, burner full of ash, dirty smoke duct or chimney depression not correct).
  • Page 21 The system pump Check if the summer function is active. doesn’t work Check the right plug-in. The pump can be blocked, burned-off or air into the system. Enabling from ambient thermostat missing (or the bridging on the plug - in case the termostat is not available - is missing - in this case the pump led is flashing).
  • Page 22 2.3. 1 0 CLEANING (FIG. 19) Cleaning operations must be carried out at regular intervals and only when the boiler is cold. Combustion residuals collect in the remova- ble drawer that must be emptied before starting the boiler. To remove all combu- stion residuals, use an ordinary aspirator and verify that all the ashes inside the com- bustion chamber have been completely...