Flowserve PMV F5 Series Manual page 8

Valve control system
Table of Contents

Advertisement

Mounting on P-2000/P-2020
– Remove front cover, indicator and cam nut from the positioner
– Replace the cam nut with coupling 1, calibrate the positioner.
– Check that the gasket is fitted to the bottom of plate 2, install screws 5 (3x
long, 1x short) plastic washer 6 and O-rings 7.
– Secure the F5 to the plate 2 with screws 3.
– Install assembly onto the positioner, make sure that coupling 1 is properly
engaged.
– Make electrical connections and calibrate.
5
6
2
7
3
1
Manual F5
– –
8

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pmv f5ex seriesPmv f5is series

Table of Contents