Flowserve PMV F5 Series Manual page 7

Valve control system
Table of Contents

Advertisement

Mounting on P5 or EP5
– See www.pmv.nu/downloads for video clip.
– Remove the front cover and the indicator from the positioner.
– Loosen and remove the Allen head screw (3) (5mm hex-wrench)
– Install drive coupling (4) on the positioner shaft, secure it with screw (3)
– Check that F5is fitted with 4 nos of screws 5 and O-ring 9, install the F5 on
top of the positioner unit, make sure that the coupling is properly engaged
before tightening the four screws 5.
– Make connections and calibrate.
– Reinstall indicator 2 and front cover 1 on the F5
O-ring seal
Mounting F5 on actuator (On/Off control valves)
Install the spindle adaptor 1 into F5 shaft, make sure that a spring clip 2
is fitted. A solid click should be heard when the spindle adaptor is
properly installed into the F5 shaft.
Mount F5 on the actuator using a mounting kit and the ISO F05 mounting
holes on the bottom of the F5. Make sure that the F5 spindle is properly
alligned on top of the actuator.
Check that the four fasteners 3 are installed into F5.
2
1
3
Manual F5
5
9
4
3
, tighten 1,5-2 Nm
1
2
5
– 7 –

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pmv f5ex seriesPmv f5is series

Table of Contents