Startup Checklist - Dynamix ITM Series Installation, Operation & Maintenance Manual

Integrated tote mixer
Table of Contents

Advertisement

Start-up Checklist
Please Review This Checklist Carefully Before Operating the Mixer
Prior to, and during start-up, please check that the following things have been done:
1. Manual has been read and followed
2. Drive coupling is fully engaged (modular design only)
3. Sufficient protection for motor (if outdoors)
4. Wiring correctly installed, grounded, and insulated
5. Impeller(s) installed correctly. See Installation Section
6. Impellers spaced correctly (if two or more) for maximum and minimum liquid levels
7. Impeller immersed in liquid and no equipment or obstructions can impact the impeller
8. Mounting Nut is threaded down and tight (tote design only)
9. Proper shaft rotation (counter-clockwise looking down, unless otherwise noted)
10. Correct voltage / amperage upon starting
Check against motor nameplate data: Record:
11. Excessive noise after start-up?
12. Excessive vibration of tank or support?
* If required
R16 122016
Record:
Inspector
Volts
Amps
db @ 3ft
Date

5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents