Avaya 9130 EBM Operator's Manual page 23

Extended battery module
Table of Contents

Advertisement

2.
Select the proper holes in the rack for positioning the EBM in the
rack (see Figure 2). The rails occupy four positions on the front and
rear of the rack.
3.
Secure one rail assembly to the front of the rack with one
×
M6
16 pan-head screw and one M6 cage nut.
4.
Using two M6 cage nuts and two M6
the rail assembly to the rear of the rack.
Position 4
Position 1
Tighten
adjustment
screws after rail attachment
(3 places each rail).
5.
Repeat Steps 3 and 4 for the other rail assembly.
6.
Tighten the three adjustment screws in the middle of each rail
assembly.
7.
If installing more than one EBM, repeat Step 1 through Step 6 for
each rail kit.
8.
Place the EBM on a flat, stable surface with the front of the cabinet
facing you.
9.
Align the mounting brackets with the screw holes on each side of
the EBM and secure with the supplied M4
Figure 3).
Avaya 9130 EBM Site Preparation, Installation and Operator's Manual
×
16 pan-head screws, attach
M6 Cage Nuts
(6 places)
×
M6
16 Pan-Head
Screws (6 places)
Figure 2. Securing the Rails
×
8 flat-head screws (see
S
164201770 Rev 1
INSTALLATION
Front of Rack
19

Advertisement

Table of Contents
loading

Table of Contents