Chapter 4
Part 3
Chapter 5
Adding a New Switch to an Existing Virtual Chassis Configuration (CLI
Procedure) ........................................................................................75
Adding a New Switch to an Existing Virtual Chassis Configuration
Within the Same Wiring Closet ..................................................75
Adding a New Switch from a Different Wiring Closet to an Existing
Virtual Chassis Configuration .....................................................76
Connecting DC Power to an EX 3200 or EX 4200 Switch ........................81
Connecting an EX-series Switch to a Network for Out-of-Band
Management ....................................................................................85
Connecting the Switch and Performing Initial Configuration
Connecting and Configuring an EX-series Switch ..........................................91
Connecting and Configuring the EX-series Switch (CLI Procedure) ..........91
Hardware Maintenance, Replacement, and Troubleshooting
Replacing Hardware Components
Field-Replaceable Units in EX-series Switches ...............................................99
Removing a Fan Tray from an EX-series Switch ..........................................112
Replacing a Member Switch of a Virtual Chassis Configuration (CLI
Procedure) ............................................................................................114
Remove a Member Switch, Replace with a Different Switch, and Reapply
the Old Configuration .....................................................................115
Remove a Member Switch and Make Its Member ID Available for
Reassignment to a Different Switch ................................................116
Table of Contents
91
99
ix
Table of Contents