Section 21 • Maintenance; Overview; Checklist - Emerson Vilter Vission 20/20 Operation And Service Manual

Micro-controller
Hide thumbs Also See for Vilter Vission 20/20:
Table of Contents

Advertisement

Section 21 • Maintenance

Overview

The maintenance screen is a convenient place to keep
track of the the maintenance performed and any up-
coming maintenance recommended by Vilter. Based on
this page, banners will be displayed on the lower status
bar. Yellow banners are to warn the operator of any up-
coming maintenance and red banners indicate mainte-
nance that is overdue.

Checklist

The check list is where the operator will perform the
maintenance sign-off, see Figure 21-1. Maintenance
Screen - Checklist. Once the operator has selected the
item to sign off, pressing the "Update" button at the
bottom of the page will perform the sign-off operation
and list the maintenance performed in the maintenance
log.
Vission 20/20 • Operation and Service Manual •Vilter/Emerson • 35391SC 1.9
Figure 21-1. Maintenance Screen - Checklist
Maintenance Name:
• This column of tasks that should be performed at the
run hours indicated in Maintenance interval column.
Select the checkbox from the maintenance task name
and press "update" button to perform the sign-off.
Maintenance Interval (Hours):
• This column indicates the Run hours at which the task
in the fi rst column should be performed. When a task
is selected, the maintenance interval will change to
refl ect the next interval.
Time Remaining (Hours):
• This column indicates the Run hours left before the
maintenance task should be performed.
21 – 1

Advertisement

Table of Contents
loading

Table of Contents