8.0 Commissioning

8.1
Prepare for commissioning - HR205
1. Refit the front door panel by hooking it over
the top lip of the appliance and swinging down.
Tighten the two case screws.
2. Ensure the telescopic hood is retracted.
3. Turn on the electrical supply. The unit will now
start running at the normal ventilation speed.
4. Pull the telescopic hood forward. The unit will
now switch to boost speed.
5. Check the operation of the cooker hood lights.
8.1a
Prepare for commissioning - HR204
1. Refit the front door panel by hooking it over
the top lip of the appliance and swinging down.
Tighten the two case screws.
2. Check the external controls are set to normal
running.
3. Turn on the electrical supply. The unit will now
start running at the normal ventilation speed.
4. Set the external control to boost. The unit will
now switch to boost speed.