Connecting
3.2 Sensor Wiring
3.2.2
Wiring Temperature Cable to Sensor
1. Locate Temperature Sensor terminal block TB1 connection screws.
2. Insert Temperature Sensor cable from transmitter into Junction Box gland.
①
Black
②
Orange
③
Brown
④
Red
⑤
Blue
Figure 3-8
Temperature Sensor Board to Junction Box Wiring
3. Connect Temperature Sensor PCB wires to Junction Box Sensor terminal board as follows:
● Insert Black and Orange wires into lug (supplied), crimp lug and connect lug to TB1-1.
● Insert Brown and Red wires into lug (supplied), crimp lug and connect lug to TB1-2.
● Tie off Blue wire.
● Make sure all terminal block lug connections are hand-tight.
4. Replace Junction Box top cover.
5. Reinstall and hand-tighten four (4) Junction Box securing bolts. Using a torque wrench,
28
torque each bolt to 6.8 to 8.1 Nm (5 to 6 ft-lbs).
⑥
Short Terminals 1 and 4
⑦
Ground Terminals 2 and 3 to Terminal 5
⑧
1012EC Series Cable
⑨
Junction Box with cover removed
⑩
Temperature Sensor Connections: TB1-1 Black/
Orange and TB1-2-Brown/Red. Tie off Blue
FUT1010 IP65 NEMA 4X & IP66 NEMA 7 Liquid Quick Start
Operating Instructions, 6/2010, A5E02639182A Revision 02