Installation Procedure - ABB ACS800 Series Hardware Manual

+c236 wind turbine convert for asynchronous slip ring generators
Hide thumbs Also See for ACS800 Series:
Table of Contents

Advertisement

Installation procedure

1
A
2
A
Top clearance
> 600 mm
(23.5 in.)
(1) The cabinet can be installed with its back
against a wall. Fasten the unit (or first shipping
split) to the floor with fastening clamps or through
the holes inside the cabinet. For the location of
the fastening holes, see delivery specific
dimensional drawings.
Note: A clearance of 600 mm (23.5 in.) minimum
above the basic roof level of the cabinet (see inset
on left) is required for cooling.
(A) Note: Leave some space at the left-hand and
right-hand sides of the line-up (A) to allow the
doors to open sufficiently.
Note: Any height adjustment must be done before
fastening the units or shipping splits together.
Height adjustment can be done by using metal
shims between the bottom frame and floor.
(2) Remove the lifting bars (if present). Use the
original bolts to block any unused holes.
53
Mechanical installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Acs800-67

Table of Contents