Panasonic UF-885 / 895
(16)
(17)
(18)
274
(16) Connect one end of the Ribbon Cable to CN50 on the FCB
(17) Secure the G3 PCB Assembly using the 4 Screws which
(17)
Note:
(18) Re-connect the Power Cord and the Telephone Line Cable.
(19) Insert the Master Firmware Card that you have prepared
(20) Turn the Power Switch to the ON (I) position.
(21) Perform the Service Mode 9-1 (Firmware Update). (See
(22) Perform the Service Mode 6 (Parameter Initialization).
(23) Turn the Power Switch to the OFF (O) position.
(18)
(24) Remove the Master Firmware Card.
(25) Re-install the remaining Covers.
(26) Turn the Power Switch to the ON (I) position.
(20)
PC Board and the other to the G3 PC Board.
came with the kit.
2 screws (
) on the top and the other 2 screws
XYN3+F8
(
) on the bottom as illustrated on the left.
DZPB000007
into the machine.
page 186)