Table of Contents

Advertisement

Unpacking

Remove all parts from the container. The following items should be included:
1. The Air/Q Appliance
2. 110/220V to 12V power adapter
3. Universal Adapter Kit
4. Airflow Switch
5. Airflow Switch cable
6. Two (2) Airflow Switch mounting screws
7. Mounting kit containing
• a mounting bracket
• 4 dry-wall anchors
• 2 long mounting screws
• 2 short mounting screws
8. Cartridge Removal Tool
9. Two (2) spare O-rings
10. Two (2) Keys for the appliance
11. Two (2) Rubber hoses
12. Two (2) Clear plastic tubes
13. Two (2) Steel tubes – one is the sensor tube, one is the injection tube
14. Two (2) Rubber grommets
6

Advertisement

Table of Contents
loading

Table of Contents