SolarEdge SE5K Installation Manual page 49

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

48
  Reporting and Monitoring Installation Data
Mapper Application
Use the Mapper smart phone application to scan the power optimizer and inverter 2D
bar-codes and create a virtual map of a PV site for enhanced monitoring and easier
maintenance.
Th Mapper application is integrated with the monitoring platform and enables:
Simple on-site registration of new systems.
Creating, editing and verifying system physical layout.
Scanning and assigning the power optimizer serial number to the correct
module in the system physical layout.
For detailed information, refer to the Mapper demo movies:
Creating new sites using the Mapper mobile application
Mapping existing sites using the Mapper mobile application
 
Physical Layout Editor
 1. If you are a registered installer, access the monitoring platform site
creation page at
web/p/home#createSites
https://monitoring.solaredge.com/solaredge-web/p/createSelfNewInstaller
 2. Fill out all required information in the screen, which includes
information about your installation, as well as details about its logical
and physical mapping.
 
Using a Paper Template
Fill out the Physical Layout Template (downloadable from the SolarEdge
website
http://www.solaredge.com/files/pdfs/physical-layout-
) using the detachable 2D barcode stickers on each power
template.pdf
optimizer. Once the form is completed, use the Mapper to scan the 2D
codes and create the map in the monitoring platform. Optionally, you can
send the sticker sheet to SolarEdge Support for physical layout creation.
https://monitoring.solaredge.com/solaredge-
. If you have not yet signed up, go to
-Three Phase System Installation Guide MAN-01-00505-1.2
.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents