SolarEdge SE5K Installation Manual page 23

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

22
  Inverter Interfaces
via the LEDs and on the SolarEdge SetApp mobile application screen,
and performing the following functions:
P Position
duration
Switch moved
to P for less
than 5
seconds, then
released.
Switch moved
to P for more
than 5
seconds, then
released.
LEDs
LEDs: three LEDs indicate, by color and state (on/ off/ blinking
(2)
flickering
/alternating
performance indications.For more information, refer to
https://www.solaredge.com/leds
The main LED indications are:
Blue ON - the inverter is communicating with the
monitoring platform
Green ON - the system is producing
(1) Blinking = Turns ON and OFF for the same duration
(2) Flickering = Turns ON for 100 mS and turns OFF for 5 seconds
(3) Alternating = alternate LED flashes
Function
Displays (via
LEDs) production
information for 5
seconds, or error type
indications (if exist)
for 5 seconds.
Activates the Wi-Fi
access point for
connecting to the
SetApp
Starts pairing
(3)
), different system information, such as errors or
.
-Three Phase System Installation Guide MAN-01-00505-1.2
Comments
While the switch is in P, all
LEDs are ON.
When the switch is released
all LEDs turn OFF for 0.5 sec
and then display the
production or error
indication.
Pairing is indicated by all 3
LEDs blinking
simultaneously.
(1)
/

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents