SolarEdge SE5K Installation Manual page 42

Three phase system with setapp configuration for europe and apac
Hide thumbs Also See for SE5K:
Table of Contents

Advertisement

Chapter 5: Activating, Commissioning and Configuring the System Using the
A gray clock icon (
temporary status, such as a connection process. When the process is complete, the icon
disappears and a constant status message is displayed.
Main Inverter Status
Power
50 kW
   P_OK: 15 of 20
Optimizers
Connected
Status
Production
CosPhi
1.00
Voltage
350 Vdc
Switch Off. Production
Commissioning
Inverter: The inverter serial number
Power: The AC output power
Voltage (Vac): The AC output voltage
Frequency: The AC output frequency
S_OK: The connection to the monitoring platform. (Server Connected appears
only if the inverter is connected to the monitoring platform).
Status: The inverter operation status: Off, Not Paired, Night Mode, Error,
Pairing, or Production
Three Phase System Installation Guide MAN-01-00505-1.2
) may appear at the top left corner of a status cell, indicating a
Status
Inverter
SN 07318000C
Voltage
Frequency
230Vac
50 Hz
Server Comm.
S_OK
(LAN)
 Switch
OFF
Limit
Country
No Limit
Netherlands
Temp
Fan
20 C
N/A
disabled 
       ›
Inverter SetApp
    41

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents