Chapter 5: Activating, Commissioning and Configuring the System Using the
WARNING!
The inverter must be configured to the proper setting in order to ensure that
it complies with the country grid code and functions properly with the
country grids.
 3. From the Language drop-down list, select the language.
 4. Tap Set Language.
Pairing
 1. From the main menu, select Pairing.
 2. Tap Start Pairing.
 3. When Pairing Complete is displayed, the system startup process begins:
Since the inverter is ON, the power optimizers start producing power and the
inverter starts converting AC.
WARNING!
When you turn ON the inverter ON/OFF/P switch, the DC cables carry a high
voltage and the power optimizers no longer output a safe 1V output.
When the inverter starts converting power after the initial connection to the AC, the
inverter enters Wakeup mode until its working voltage is reached. This mode is
indicated by the flickering green inverter LED.
When working voltage is reached, the inverter enters Production mode and
produces power. The steadily lit green inverter LED indicates this mode.
 4. Tap OK to return to the main menu.
Communication
Communication settings can be configured only after communication connections are
complete. Refer to Setting Up Communication on page 49.
 1. Select the Communication menu to define and configure the following:
The communication option used by the inverter to communicate with the
monitoring platform
The communication option used to communicate between multiple
SolarEdge devices or other external non-SolarEdge devices, such as
electricity meters or loggers.
 2. Tap the Server red arrow to set the communication method to be used for