Assembly, installation and commissioning

Location

The machine should be placed on a flat surface, with sufficient load-bearing capacity. A Javo engineer should be
present during delivery of the machine to unload it from the truck.

Assembly / connection

Any loose components supplied together with the machine should be fitted to the machine. When doing so ensure
that the moving parts are free and no pot holders have be placed in the machine.
When the machine is fully assembled, it can be connected to the power supply (by a qualified individual) by inserting
the plug into the socket.

Setting-up / adjusting

The following points must be checked before starting the machine:

Covers and doors

All covers and doors must be closed and secured.

Elevator direction of movement

The direction of movement of the elevator must be from top to bottom.
If it is not, have an engineer correct this.
On the SE type the elevator runs in the opposite direction, so from bottom to top.

Drill direction of movement

The drill direction of movement is always to the right (clockwise).

Type of soil

Depending on instructions.

Soil belt tension

Version 2010-11-1
The tension is correct when the belt hangs down ± 40 mm in the centre.
The tension can be adjusted by turning the nuts (A) simultaneously.
The four bolts (B) on the block bearings must be loosened before turning these
bolts.
The tension is correct when the belt hangs down ± 40 mm.
Javo Standard potting machine manual
Page 8