Worcester Greenstar i Series Installation, Commissioning And Servicing Instructions page 48

Wall hung rsf gas fired condensing system boiler for sealed central heating systems and indirectly fed domestic hot water
Table of Contents

Advertisement

SERVICE AND SPARES
▶ Undo connection to boiler at the service valves.
1.
Fig. 124 Removing expansion vessel from wall frame
▶ Release the clip from expansion vessel connection to the pump
manifold.
▶ Carefully lift the boiler off the mounting frame.
1. Remove the expansion vessel retaining screw.
2. Lift the expansion off the cross beam.
3. Pull the expansion vessel towards you to remove.
▶ Replace expansion vessel in the reverse order and refit the boiler to
the mounting frame.
▶ Follow the commissioning procedure in this manual.
48
2.
3.
6 720 804 532 (2012/09)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Greenstar 24iGreenstar 12iGreenstar 15iGreenstar 18i

Table of Contents