Unventilated Compartment Installation Clearances (millimetres)
The suggested total unventilated compartment minimum clearances
are:
Side
Above
400
170 approx.
(30 above the elbow)
Table 11 Minimum unventilated compartment clearances
If Side Clearances are Reduced (millimetres)
If total side clearance is
Increase height
reduced to:
clearances to (approx):
(Combined left & right
(Combined top and
clearances excluding
bottom clearances
the appliance)
excluding appliance)
350
441
300
523
250
617
200
717
150
856
100
1012
50
1202
Table 12 Reduced side clearances
If Front Clearance is Reduced (millimetres)
If front clearance
Increase overall height
(to removable
clearances to (approx):
door) is reduced
(Combined top and
to:
bottom clearances
excluding appliance)
50
511
25
596
Table 13 Reduced front clearances
3.6.6 BATHROOMS
A boiler fitted with a mechanical timer or RF mechanical timer (receiver)
or FW100 controller may only be installed outside the shaded area.
A boiler with any other timer fitted (or blanking panel for optional
programmer) can be installed in zone 2.
Additional RCD (Residual Current Device) protection may be required.
Refer to the latest IEE wiring regulations.
Radius 600mm
Fig. 19 Bathroom installations
6 720 804 532 (2012/09)
Below
Front
(to removable door)
200
100
O
Front clearance
R
(to removable
door) must be
increased to:
129
161
200
243
295
358
434
O
Increase total side
R
clearance to:
(Combined left and
right clearances
excluding appliance)
505
569
6720646608-124.3Wo
3.7
PLUMBING MANIFOLD
3.7.1 CONNECTIONS
WARNING: IF FITTING AN OPTIONAL INTERNAL
DIVERTER VALVE
▶ Refer to the "Greenstar Optional Integral Diverter
Valve" installation instructions.
Heating System
22mm compression fittings
Gas
22mm
Use the fittings supplied in the Hardware literature pack.
• If the boiler pipes are to be run behind the appliance ensure that the
pipes pass through the slot in the white cardboard guide. This is fitted
to the frame.
Further guidance on pipe routing can be found printed
on the boiler template (supplied with the boiler).
• For further ease of fitting, an optional Vertical Pre-piping Assembly kit
is available, comprising five pre-formed copper pipes and an earth
bonding strip.
Part number: 7 716 192 570.
• To cover the pipe work under the boiler, down to the counter top, an
optional "Below boiler pipe cover" can be used.
Part number: 7 716 192 608
4
1
Fig. 20 Pipe dimensions
PRE-INSTALLATION
2
3
5
15