Preparing for Installation
Environment
Commercial building contains a mix
of information technology equipment
and industrial equipment, such as
welding.
Existing commercial building is not
subject to natural environmental noise
or man-made industrial noise. This
building contains a standard office
environment. This installation has a
history of malfunction due to
electromagnetic noise.
New commercial building is not subject
to natural environmental noise or
man-made industrial noise. This
building contains a standard office
environment.
Existing commercial building is not
subject to natural environmental noise
or man-made industrial noise. This
building contains a standard office
environment.
Note
In all situations, grounding practices must comply with Section 250 of the National Electric Code (NEC)
requirements or local laws and regulations. A 6 AWG grounding wire is preferred from the chassis to the rack
ground or directly to the common bonding network (CBN). The equipment rack should also be connected to
the CBN with a 6 AWG grounding wire.
Note
Always ensure that all of the modules are completely installed and that the captive installation screws are
fully tightened. In addition, ensure that all the I/O cables and power cords are properly seated. These practices
are normal installation practices and must be followed in all installations.
Caution
Category 5e, Category 6, and Category 6a cables can store large levels of static electricity because of the
dielectric properties of the materials used in their construction. Always ground the cables (especially in new
cable runs) to a suitable and safe earth ground before connecting them to the module.
Electromagnetic Noise
Grounding Recommendations
Severity Level
Medium to High
Best grounding practices must be closely
followed.
Medium
Best grounding practices must be closely
followed. Determine source and cause of
noise if possible, and mitigate as closely as
possible at the noise source or reduce
coupling from the noise source to the
victim equipment.
Low
Best grounding practices should be
followed as closely as possible.
Electromagnetic noise problems are not
anticipated, but installing a best-practice
grounding system in a new building is often
the least expensive route, and the best way
to plan for the future.
Low
Best grounding practices should be
followed as much as possible.
Electromagnetic noise problems are not
anticipated, but installing a best-practice
grounding system is always recommended.
Cisco Catalyst 9600 Series Switches Hardware Installation Guide
System Grounding
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Catalyst 9606r

Table of Contents