Daikin VRV-WII FXYCP30MY1 Installation Procedure page 18

Table of Contents

Advertisement

1
Installation of outdoor
1 - 7 Field wiring
1 - 7 - 4
Examples
[Setting the cool/heat operation type]
1
Performing cool/heat setting with the remote controller connected to the indoor unit.
Keep the COOL/HEAT selector switch (DS1) on the outside unit PC board (A1P) at the factory setting position OFF.
O
u
t
To indoor unit
On
Off
Remote controller
2
Performing cool/heat setting with the COOL/HEAT selector.
Connect the COOL/HEAT selector (optional) to the A/B/C terminals and set the COOL/HEAT selector switch (DS1) on the outside unit PC board
(A1P) to ON.
O
u
t
On
Off
COOL/HEAT selector
For the above wiring, always use sheathed vinyl cords with 0.75 to 1.25 mm2 or cables (2 core wires). (3 core wire are allowable for the COOL/
HEAT selector only.)
All transmission wire is field supply.
If the following limits should be exceeded, be careful that any abnormal transmission may be caused;
Maximum wiring length ................................1000 m or less
Total wiring length .......................................2000 m or less
Maximum branching ....................................16 branching or less
Wire length between outside unit ................30 m or less
Never connect power supply to any connection wiring and its terminal block, otherwise the entire system may be damaged.
Up to 16 branches are possible for transmission wiring. However no branch is allowed after branch.
Branch
Branch after branch
The wiring to the indoor units must be connected to the F1/F2 (To IN/D UNIT) terminals on the PC board in the outside unit.
• Installation procedure
®
• VRV
Systems • Installation procedure
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vrv-wii fxycp20my1Vrv-wii fxycp10my1

Table of Contents