Test Run; Before Test Run - York HIC4008B21S Installation And Maintenance Manual

Inverter-driven multi-split system heat pump air conditioners, 4-way cassette
Hide thumbs Also See for HIC4008B21S:
Table of Contents

Advertisement

9.

Test Run

9.1

Before Test Run

Verify that there are no problems with the installation, and do not perform Test Run until all the following
conditions have been resolved.
Refer to the "Installation and Maintenance Manual" for the outdoor unit for details on Test Run operations
from the outdoor unit.
Verify that refrigerant piping and the communication cable are connected to the same refrigerant cycle
system. If not, it will cause an abnormal operation and damage to instrumentation.
1. Verify that electrical resistance is more than one megaohm, by measuring the resistance between
ground and the terminal the terminus for electrical components. If the electrical resistance is less than
one megaohm, do NOT operate the system until the electrical current outflow to ground is detected
and repaired. Do not introduce any high voltage to the terminals of the communication cables
(TB2 [A, B, 1 and 2]).
2. Verify that each wire is connected correctly at the correct phase for the power supply. If it is incorrectly
connected, the unit will not operate and the wired controller will display the alarm code "05". In this
case, check the phase for the primary power supply according to the "Attention" label affixed to the
back side of the service cover. Then, with the power supply turned OFF at the power supply, remake
the necessary connections.
3. Check to ensure that the main power supply has been turned ON for more than 12 hours, to warm up
the compressor oil by the crankcase heater.
4. Verify that all DIP Switch settings are correct. Refer to Section 8.6 "DIP Switch Settings".
9.2
Test Run
After all installation work is completed, Test Run should be performed.
1. Check to ensure that stop valves (gas and liquid) for the outdoor unit are fully opened.
2. Whenever indoor units are connected to the VRF system, perform the Test Run for the indoor units
one by one sequentially and then check the refrigerant piping system and the electrical wiring system
for conformity. (If these multiple indoor units are operated simultaneously, system conformity cannot be
verified.)
3. Perform the Test Run in accordance with the following procedure. Ensure that the Test Run is carried
out without any problem. The following procedure shows a case where a wired controller is utilized.
If other controllers are activated instead, refer to the "Installation and Maintenance Manual" for those
other controllers.
NOTE:
The outdoor unit may not be operated depending on the indoor and outdoor temperature conditions.
Refer to the "Installation and Maintenance Manual" for outdoor units for details.
a. Press and hold "Menu" and "Back/Help" simultaneously for at least 3 seconds.
The Test Run menu will be displayed.
The Test Run menu will be displayed.
Test Run Screen
Test Run Setting: 2 units
MODE
SPEED
Sel.
Adj.
P5417054
COOL
AUTO
ON
Rtrn
Back
NOTE
When the "00 unit" is displayed, the auto-address
function may be working.
Cancel "Test Run" mode and reset.
37

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents