General Operating Procedures - New Leader L3020G4 General Manual

Table of Contents

Advertisement

1. Make sure unit has been properly serviced and is in good operating condition. Field test
unit prior to first use, prior to each spreading season's use, and following overhaul or repair
work, to verify that all components and systems are functioning properly. See "Field
Testing" section.
2. Fill body with material to be spread.
3. Drive to location where spreading is to be done.
4. Adjust spinner control valve for material being applied to give spread width desired. See
"G4 Spread Pattern" section.
5. Adjust spinner to give spread pattern desired. See "G4 Spread Pattern" section.
6. Set feedgate opening to obtain the yield desired. Measure actual material depth.
7. Make sure shut-off valve on hydraulic reservoir is fully opened.
8. Turn on power to controller and set program to desired values.
9. Engage pump drive PTO.
CAUTION
10. Drive at speeds that allow engine to turn at proper RPM.
Higher transmission gears may be used with speeds to 30 MPH. If lower speeds must be
used, shift transmission into lower gears so engine speed can be maintained to allow
adequate hydraulic oil delivery from pump.
CHANGE THE HYDRAULIC OIL FILTER AFTER THE FIRST WEEK
IMPORTANT!
(OR NOT MORE THAN 50 HOURS) OF OPERATION ON A UNIT.
P l e a s e G i v e P a r t N o . , D e s c r i p t i o n a n d U n i t S e r i a l N o .

GENERAL OPERATING PROCEDURES

Drive only at speeds which permit good control of vehicle!
33
HIGHWAY EQUIPMENT COMPANY
97372-B
Page Rev. A

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents