Chrysler 300M 2002 Service Manual page 966

Table of Contents

Advertisement

LH
CAMSHAFT(S) (Continued)
1 – CAMSHAFT BEARING CAP - INTAKE
2 – CAMSHAFT BEARING CAP - EXHAUST
3 – CAMSHAFT - EXHAUST
4 – ROCKER ARM
5 – HYDRAULIC LIFTER
6 – CYLINDER HEAD
INSTALLATION
CAUTION: When the timing chain is removed and
the cylinder heads are installed, DO NOT rotate the
camshafts or crankshaft without first locating the
proper crankshaft position. Failure to do so will
result in valve and/or piston damage.
(1) Assemble camshaft chain on the cams. Ensure
that plated links are facing toward the front. Align
the plated links to the dot on the camshaft sprockets
(Fig. 25).
(2) If camshaft chain tensioner is already in the
compressed and locked position, proceed to step (4).
(3) When the camshaft chain tensioner is removed,
it is necessary to compress and lock the tensioner
using the following procedures:
(a) Place tensioner into a soft jaw vise (Fig. 24).
(b) SLOWLY compress tensioner until fabricated
lock pin or the equivalent can be inserted into the
locking holes.
(c) Remove compressed and locked tensioner
from the vise.
Fig. 20 Camshaft and Valvetrain Components
7 – CAMSHAFT (SECONDARY) CHAIN TENSIONER
8 – CYLINDER BLOCK
9 – CYLINDER HEAD
10 – CAMSHAFT - INTAKE
11 – CAMSHAFT (SECONDARY) TIMING CHAIN
(4) Insert the compressed and locked camshaft
chain tensioner in-between the camshafts and chain.
(5) Rotate the cams so that the plated links and
dots are facing the 12:00 O'clock position (Fig. 25).
(6) Install cams to cylinder head. Ensure that
rocker arms are correctly seated and in proper posi-
tions.
(7) Install camshaft bearing caps. Ensure that
bearing caps are installed in same position as
removed.
(8) Tighten cam bearing cap bolts gradually in
sequence shown in (Fig. 22) to 12 N·m (105 in. lbs.).
(9) Install secondary chain tensioner bolts and
tighten to 12 N·m (105 in. lbs.).
(10) Remove locking pin from secondary tension-
ers.
(11) Measure camshafts end play. (Refer to 9 -
ENGINE/CYLINDER HEAD/CAMSHAFT(S) - STAN-
DARD PROCEDURE)
(12) Install the primary timing chain. (Refer to 9 -
ENGINE/VALVE
TIMING/TIMING
AND SPROCKETS - INSTALLATION)
ENGINE 2.7L 9 - 29
BELT/CHAIN

Advertisement

Table of Contents
loading

This manual is also suitable for:

Concorde 2002Intrepid 2002

Table of Contents