Mira SELECT Installation & User Manual page 20

Thermostatic mixer
Hide thumbs Also See for SELECT:
Table of Contents

Advertisement

4. Determine the finished wall position (e.g. tile
thickness). Turn off the water supply, carefully
uncap the brass nipple and, if necessary, cut to
length, the brass nipple must protrude through
the finished wall surface by 20–22 mm
5. Secure the building-in shroud to the mixing
valve using the two building-in shroud screws
removed earlier.
6. Using the building-in shroud as a guide, finish
the wall, e.g. tiles.
Caution! Make sure that the finished wall is
within the maximum and minimum limits and to
an even depth (no greater than 2 mm variation)
or the control components will not fit correctly.
Min Finished
Wall Surface
Max Finished
Wall Surface
7. Remove the two building-in shroud screws
(retain for later use) and remove the building-in
shroud.
8. Apply liquid sealant or PTFE tape to the
exposed end of the brass nipple. Screw the
mounting bush on until the backplate is loosely
clamped against the wall. Then rotate the
backplate and position as shown to align the
arrow and release slot. Tighten the mounting
bush with a 24 mm A/F spanner.
Brass Nipple
Backplate
Finished Wall
F9802
Min
Max
Foam Seal
Backplate
Mounting
Bush
Release Slot
9. Push the elbow fully into the backplate and
rotate it clockwise, a 'click' will indicate when
it is locked. To unlock, insert a small flat
blade screwdriver into the release slot on the
underside, then turn the elbow anticlockwise
until it is released from the backplate.
Backplate
Release Slot
10. Locate the shroud over the elbow, then
carefully push until it 'clicks' into place
securely.
11. This completes the installation of the RAC
assembly, fit the concealing plate and
control assembly. Refer to section: 'Control
Assembly'.
20
Backplate
Elbow
To Unlock
Elbow
Shroud
To Lock

Advertisement

Table of Contents
loading

Table of Contents