8. Fit the hot and cold supply pipes (hot - left,
cold - right) and tighten the compression
nuts.
Caution! Make sure that the olives are fitted
and all pipework is flushed through before
connecting to the mixing valve.
Hot
9. Connect the outlet pipework and install the
RAC assembly or BIR assembly, before
continuing with the installation of the mixing
valve.
RAC assembly, go to section: 'Installation,
RAC Assembly'.
BIR assembly - refer to your shower fittings
installation and user guide.
10. Fit the concealing plate and control assembly.
Refer to section: 'Control Assembly'.
Outlet Pipe to
Fittings
Cold
16